US$ 18.75
Sampling procedures for inspection by variables - Guide to double sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection Ingestion-build-209418 and inventory management of items
$174.00
Description
and inventory management of items
Selecting evaluators who calculate predicted energy savings is out of the scope of this document
BS EN 50164-6:2009 Lightning protection components (LPC)
BS 6367 and BS 6465-1
Sampling procedures for inspection by variables - Guide to double sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection Ingestion-build-209418 and inventory management of itemsBS 6002 3: 2005 is intended for those designing sampling procedures for product inspection (in production or at customer acceptance) where there is a variable to be measured rather than a simple pass fail and that variable is bounded by an upper and lower acceptable quality limits. This standard provides methods that ensure that lots (batches) of acceptable quality have a high probability of acceptance and inferior lots have a high probability of
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 285.49
US$ 15.00
US$ 130.15
US$ 135.50
US$ 199.74
US$ 103.12
US$ 154.18
US$ 104.08
US$ 226.90
US$ 82.32
US$ 170.03
US$ 179.78
US$ 387.50